In direct-sowing rice culture using cloth mulch, puddling and leveling (P & L) is usually done 2 days before the mulching (sowing). However, the mulching is very difficult, due to the muddy condition of the soil. Comparative studies were made to observe the effects of the timing of P & L, that is, P & L 10 days before mulching (P10) vs. P & L 2 days before the mulching (P2), on the operator's physical stress, the rice growth, and grain yield. Basal fertilizer was applied 2 days before the mulching in the P2 treatment (P2-B2), and topdressing was applied at 29 days before heading in all treatments. For the P10 treatment, timing of the basal fertilization was set at 14 (P10-B14) or 3 (P10-B3) days before the mulching. Results revealed that... |