|
|
|
|
|
Henry, Pierre; Özeren, Sinan; Yakupoğlu, Nurettin; Desprez De Gésincourt, Olivier; Papoutseli, Christos. |
The objective of this cruise was to recover from Çınarcık Basin an instrumented frame deployed during a previous R/V Yunus-S cruise, November 12-13, 2018, recover the data recorded by the instruments, do maintenance and redeploy the frame at another site, in the Central basin. The frame was successfully recovered. The RBR/Paroscientific (Digiquartz) bottom pressure recorder functioned properly throughout the 6-month deployment. The other instrument, a Seaguard doppler recording current meter (RCM) equipped with additional sensors, operated properly for one month after deployment and stopped, presumably because of battery power failure. Pressure records from both instruments match but the noise level of the Digiquartz pressure sensor is about 1/50 of the... |
Tipo: Text |
|
Ano: 2019 |
URL: https://archimer.ifremer.fr/doc/00630/74225/73859.pdf |
| |
|
|
Henry, Pierre; Özeren, Sinan; Yakupoğlu, Nurettin; Desprez De Gésincourt, Olivier. |
The primary objectives of this cruise were to recover an instrumented frame deployed in Kumburgaz basin during a previous R/V Yunus-S cruise January 29-30, 2018, recover the data recorded by the instruments, do maintenance and redeploy the frame at another site, in Çınarcık Basin. This cruise was also an opportunity to perform coring in Kumburgaz basin with a light gravity corer provided by İTÜ. The frame was successfully recovered. The bottom pressure recorder functioned until battery failure August 14, 2018. The other instrument (a Seaguard doppler recording current meter equipped with additional sensors) had failed during descent because of an insulation fault on a sensor and did not provide any useful data. The instrumented frame was redeployed at the... |
Tipo: Text |
|
Ano: 2018 |
URL: https://archimer.ifremer.fr/doc/00630/74224/73858.pdf |
| |
|
|
Henry, Pierre; Özeren, Sinan; Çakir, Ziyadin; Yakupoğlu, Nurettin; Desprez De Gésincourt, Olivier. |
The objective of this cruise was to recover from the Central Basin an instrumented frame deployed during a previous Istanbul University R/V Yunus-S cruise, May 8-9, 2019, recover the data recorded by the instruments, do maintenance, and redeploy the frame at another site, in Imrali basin. The frame was successfully recovered. The RBR/Paroscientific (Digiquartz) bottom pressure recorder functioned properly throughout the 6-month deployment. The other instrument, a Seaguard doppler recording current meter (RCM) equipped with additional sensors, operated properly during the whole period, except for the conductivity sensor. The instrument was at the outlet of a canyon located close to the epicenter of the Sept 26, 2019 Magnitude 5.8 earthquake. Following the... |
Tipo: Text |
|
Ano: 2019 |
URL: https://archimer.ifremer.fr/doc/00630/74226/73860.pdf |
| |
|
|
|