|
|
|
|
|
Wang, Yanhong; Li, Jialin; Wang, Jian; Zhang, Renshun. |
Reclamation of tidal flat is one of the main ways to get a dynamic balance of the total amount of plowland. With the development of social economy and the increasing demand for plowland, the contradiction between tidal flat reclamation and environment protection becomes more and more outstanding. However,tidal flat reclamation should also follow the dynamic balance of total amount of tidal flat amount. The paper analyzed the history of reclamation and development of Jiangsu mud coast, and calculated the feasible rates of tidal flat reclamation on different stretches respectively, and pointed out that both the economic social benefits of reclamation and the natural erosion-accretion conditions of the coasts should be taken into consideration in deciding the... |
Tipo: Journal Contribution |
Palavras-chave: Mud flats; Reclamation. |
Ano: 2007 |
URL: http://hdl.handle.net/1834/5853 |
| |
|
|
Li, Jialin; Wang, Yanhong; Zhang, Renshun. |
Most of the flood from the wide inner lowland plain discharges through tide locks on coast, and the influence of tidal flat inning projects on the tide lock drainage must be solved by seawall line choice. Taking the Cangdongpian inning area on the west side of Tiaozini Sand as a case study, the paper analyzed the compages and validity of ebb tide water to maintain the flood discharge creek below the tide lock for different projects of seawall line. Result indicates that a rational seawall line program has little influence on the flood discharge of lock during the mean tide or general spring tides, but has certain influences during a storm surge or an extreme spring tide in autumn. However it could be resolved by several times of artificial scour on the... |
Tipo: Journal Contribution |
Palavras-chave: Tidal flats; River discharge. |
Ano: 2007 |
URL: http://hdl.handle.net/1834/5854 |
| |
|
|
|