The present work aimed at determining and evaluating the kinetic parameters from the UASB reactor treating swine manure effluent in a lab-scale experiment. The research was carried out in the Laboratory of Water Analysis at the Engineering Department (LAADEG) at the campus of Federal University of Lavras - UFLA. The system was assembled with an acidification and equalization tank (AET), an UASB reactor and an aerated facultative pond (AFP). The hydraulic retention time (HRT) adopted in the UASB reactor were: 55; 39; 34; 24; 17; and 16 hours. The operational average temperature in the UASB reactor was 25 ± 2ºC. The kinetic studies used the following parameters: Chemical Oxygen Demand (COD T), Total Volatile Solids (TVS), Temperature, Flowrate and Total... |